5.8.2.1.12.1.  General " tab page

General " tab page

General " tab page

  • Test selection -> List field:

    • User: Free input

    • QA-State-5: Everything is set so that the QA status is raised to 5 after a successful run.

    • QA-Checker-Plugin:

  • Calculate geometry this function is used to test the values (table rows) of all geometries (*.3db drawing files). Characteristics that lead to an "impossible" structure, such as a negative value for a width across flats, are logged as errors. The calculation process may take a long time (depending on the catalog size).

  • Retest projects that have already been tested [Test already tested projects]:

  • Test value ranges:

    • As many value range combinations as possible are gone over and it is checked whether the 3D geometry can be build correctly.

    • If Test order number for uniqueness is also activated, the system also checks whether there are duplicate order numbers in the tested variants.

    • If there is a ReverseConfig for a project, then it is checked whether the order number can be found via the ReverseConfig.

    • If no ReverseConfig is available, the system checks from SP5 whether the Index order numbers depending on value ranges [Index order numbers dependent on value ranges] switch is activated.

    See also Section 5.12.7, “Classification according to CNSORDERNO / CNSTYPECODE ”.

  • Maximum test time (minutes)

  • Job server [Job Server]:

  • Line filter:

  • Maximum number of parallel tests:

    The initial display value (default value) corresponds to the available CPU cores (*2 for hyperthreading if available).

    Leave this setting if there are no problems like a jerking mouse cursor, for example.

    The reduction of parallel tests (CPU cores) by one or two (depending on the used machine), should leave enough performance for a trouble-free working.

    However, be aware that a test itself can use multi-threading, so that using the half of cores does not automatically mean the use of half of the CPU. If also other CPU-intensive processes shall be started, then you have to consider theses, too.