8.5.2. Catalog update for ERP integration

If ERP integration is available, data records in the LinkDB are assigned to a specific project line (project path + LineID).

When a catalog is updated, the data records in the link database are usually automatically reassigned to the projects and lines of the new version. However, the assignment may not be possible:

Reasons can be:

  • Changes to the project (table, geometry, standard designation)

  • Project postponed

  • Projects/lines deleted