4.15.3.5.3. Moved dataset

If directories or projects have only been moved, the relevant project and the parent directories are marked in the Catalogs dialog area (left) with the orange arrow symbol icon. The arrow symbol overlays the respective basic symbol (directory , project line ).

If directories or projects have only been moved, no specific changes can be seen in the Line assignment [Line mapping] dialog area (right).

The only value changes are at the variables "Active State" and "Requested State" (compare Section 4.15.3.5.1, “ACTIVE_STATE and REQUESTED_STATE ”).

You can see the new project path under Assigned project.

Now you have two options:

Approve assignment

Revoke assignment and save changes

Afterwards in the index tree the respective icons or are displayed.

If a project has only been moved and in other ways is unchanged, it makes sense to release the whole project in one step. On this see Section 4.15.3.5.5, “Conduct assignments across lines”.